Photo 1
    
ColoradoSprings.com is sponsored by
TONIGHT'S EVENTS
Mar
10
Mar
11
Mar
12
Mar
13
Mar
14
Mar
15
Mar
16
arapahoebasin.com
Replica of new lift.

Other Articles in this Category

  • A-Basin goes high-speed

    The Gazette

    Funky ol’ A-Basin seems bent on turning into a real resort these days. Last year, we got new terrain on the backside. Next season, an honest-to-goodness high-speed quad replacing the Exhibition chair. After this, I fear, comes paid parking.

    Here’s the release:

    The new, high speed quad chairlift that will be constructed this summer at Arapahoe Basin has found a name – Black Mountain Express.  Alan Henceroth, COO of A-Basin, put a call out to A-Basin aficionados to help name the lift.  He received hundreds of suggestions from “Quadzilla” to “Chairway to Heaven.”  After much contemplation and days of looking through suggestions by A-Basin management, some of them very entertaining, “Black Mountain Express” won the crown.

    The new lift will replace the Exhibition fixed-grip triple chair located in the base area, which was installed in 1978.  The new lift will have a capacity of 2000 people per hour, a length of 2877 feet and have a vertical rise of 719 feet.  The ride time will be just under three minutes, half the time of the current lift ride from base area to mid-mountain.

    Construction is scheduled for mid-June and will not impact the current season’s closing date (tentatively scheduled for June 6, 2010) or opening date next fall.  The top terminal of the new lift will be slightly realigned uphill and to the west away from Black Mountain Lodge.  The lower terminal will remain in the same location.

    Track the new lift’s progress at:

    http://www.arapahoebasin.com/ABasin/mountain/lift-construction.aspx

     

    For more snow news, visit the Gazette's Out There Blog


    See archived 'Snow Ride' stories »
     



    ADVERTISEMENT 
    ADVERTISEMENT